Friday, October 26, 2012

Since I have a little bit of time to breathe -- and by a little bit, I mean I spent the whole day (since 9:30AM) wasting time and watching anime -- I think it's a good time as any to tell you about my new place!

Wooden floors, an outdoor deck, a sizable kitchen with SO MUCH STORAGE SPACE OMG! It's a little bit outside the city, kind of like the quiet Old Ampang area with lots of small shops and stuff. I like it. :3 Also, it doesn't come fully furnished so I can have a small bed and giant working tables instead of occupying the space in the living area and making a mess. I'm also doing up the decking as a reading nook and BBQ area for those lovely, warm days, no matter how infrequent they are. Might clean all the rubble from it since it's messy with leaves but I'm already thinking of the furniture placement within the space with a dedicated corner for the TV and PS3.

AND I won't be spending that much on the rent (compared to my current place). two minutes from a train station and a Woollies just at the corner. NAISE.

WOODEN FLOORS OMG.

But the bathroom has a step up at the shower so I need to make little steps to make it easier for me to go up and down. The step-up for the shower is bizarre...

Alright, now back to bizness.

Uni is on its final two weeks, I have a tech folio and a studio folio due ASAP because I'd rather spend my time moving and loafing around because my brain has clocked in to holiday mode and I can't stop it. There's waaaaaaaaaaay too many things going on over summer break.

To do:

- Studio folio
   -- Base plan
   -- Sourcing materials
   -- designing adequate things to project, making 'film' from scratch. This is going to be fuuuuuuun...
   -- designing the booklet that goes with the whole box projector
   -- MOST IMPORTANTLY wtf does it all mean?? (Tie in to Projects 1 and 2, as well as most written docs)

- Tech folio
   -- 3D: Mezz, Living/Kitchen/Dining, Decking, Bathroom to WIW, WIW to Bedroom, look from decking/backyard to inside of the house through the sliding doors (I can definitely split this up into two seperate spaces)
   -- All 2D cad (especially the detailing)
   -- specification sheets: materials only, no furniture
   -- table of contents

Doesn't look like much does it? Well, it is a decent amount of work to be completed within this week starting with the Studio folio. Tech's due on the 7th, thank goodness. AND it means there should be free space in the uni comp labs for me to occupy three or four computers to do super wonderful renders. YUSH!

No comments: